Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
European-Football-betting-media@cnyautofinder.com
武昌理工学院
欧洲杯押注
欧洲杯买球平台
中国玩具网
荀嘉广告联盟
新华网重庆频道
Buy-ball-app-contactus@aroonudaisangbad.com
Perimeter-football-service@okjiaju.net
博彩平台排名
银河在线游戏
中国国际商贸城
中学生读书网
Gambling-platform-customerservice@daqing56.com
Euro-2024-betting-support@xuanbs.com
骂人宝典
临沂物流城网
Sports-betting-help@selkarvictory.com
武汉大学口腔医院
买球平台
太湖字谜网
郑州理工职业学院
移动上网导航
笔趣阁
爽网社区
福客民俗网
游惠宝
温岭人才网
当当网上书店
T9社区
罗茨鼓风机
创易网络
站点地图
共同管业